The units depicted above are for the cryogenics industry they were constructed at Puma engineering’s workshop facility.
We received the container and the free issue components into our facility, we then installed the components into the container whilst concurrently fabricating the interconnecting pipe work and ducting.
Once the pipe work and ducting was made available this was also installed into the container by our in-house engineering team ensuring that all interfaces were correctly satisfied.